We Build Data Centers That Work

Your deadline isn't negotiable. Neither is ours.

There’s a difference between installing a data center and building one that actually works when you need it. When you hire us for turnkey installation, you get one vendor, one contract, and one point of accountability. No subcontractor finger-pointing. No timeline excuses. Just a data center that powers on when we say it will.

We handle everything—site preparation, racks, power, cooling, cabling, equipment deployment, testing, and documentation. Greenfield builds, retrofits, or expansions in live facilities. Your timeline becomes our contract.

What Turnkey Actually Means

Complete data center from empty building to production-ready. Site prep, raised floors, rack installation, power distribution, precision cooling, fire suppression, monitoring systems, structured cabling, equipment racking, and commissioning.

Most contractors split this across multiple subs—electrical, HVAC, cabling, equipment teams. That creates coordination nightmares. We don’t work that way. Our crews handle the entire build. When something goes wrong, there’s nobody else to blame.

Testing isn’t optional. Every cable gets certified—fiber OTDR, copper to Cat6A standards. Power systems get load-bank tested. Cooling verified under full load. Nothing goes live without documented proof it works.

Testing isn’t optional. Every cable gets certified—fiber OTDR, copper to Cat6A standards. Power systems get load-bank tested. Cooling verified under full load. Nothing goes live without documented proof it works.

Documentation delivered before final invoice: as-built drawings, cable maps, test reports, equipment inventories, and maintenance procedures. Not weeks later—before we close the project.

Three Project Types

Greenfield builds

Start from empty space. Complete design control. 8-16 weeks. Best for hyperscale facilities and purpose-built operations.

Retrofit projects

Transform existing buildings into modern data centers. Tighter constraints, faster execution. 6-12 weeks. Common for enterprise facilities and urban locations.

Expansions

Add capacity to live facilities. Zero-downtime installations with night and weekend work. 3-8 weeks. The key is planning work windows that don’t impact production.

Timeline Commitments

We don’t estimate. We commit.


Small installations (10-30 racks): 5-8 weeks
Medium projects (30-100 racks): 9-15 weeks
Large facilities (100+ racks): 15-23 weeks

These aren’t estimates. We build contingency into schedules before we quote. Weather delays, equipment issues, permit slowdowns—we’ve planned for it. When we say eight weeks, we mean eight weeks.

On-time delivery or we compensate. That’s in the contract.

Finnish SISU

When we say a project will be completed on time, it will be. We don’t give up when challenges arise. We take it across the finish line, no excuses. That’s our way.


Single point of accountability.

One vendor. If something breaks, it’s our problem. No passing blame between contractors.

Speed without chaos.

We move fast because we’ve done this hundreds of times. We know where projects stall and how to prevent it.

Quality first pass.

Re-work kills schedules. We test during installation, not after. Problems get caught early when they’re cheap to fix.

Real documentation.

Complete as-builts in AutoCAD. Cable maps. Test reports. Delivered before final payment, not weeks later.

What's Included

Site preparation, raised floors, rack installation and anchoring, power distribution (PDU/UPS), precision cooling, fire suppression, environmental monitoring, complete structured cabling, equipment deployment, and commissioning.

Plus: Logistics management, safety compliance, quality assurance, operations training, 90-day support, one-year warranty, and 24/7 emergency response.

Everything. One vendor. One deadline.

Ready to Start?

Tell us about your facility, timeline, and requirements. We’ll tell you honestly if we’re the right fit.

Phone: +358 50 4000588 (8-18 EST)
Email: info@ainetworks.fi

FAQ

Common Questions

Small projects start ~$500K. Medium builds $2M-$10M. Hyperscale custom-quoted. We’ll give you a ballpark in 30 minutes.

Probably. We’ve done projects in half the standard time. Requires premium scheduling and costs more. Tell us your deadline.

Yes. Nightshifts. Weekend work. Zero-downtime installations. Standard for us.

We handle change orders. Early changes are easier. We’ll give honest impact assessments before you commit.

We inspect on delivery. Damaged items returned immediately. You don’t pay for our time while waiting for replacements.

The first 90 days are included. After that, we offer maintenance contracts or can train your team. You decide.